ECLIM VIETNAM ENVIRONMENT JOINT STOCK COMPANY
  • Quality reputation
    Best products and services
  • Dedication - Responsibility
    With our customers is No. 1
  • 0941 113 286
    0968 279 976
Menu

Wastewater treatment system for dental clinics 24 m3/day

  • 0 đánh giá
Contact For Price:
Description:

Capacity: 24m3 / day

Power supply 1 - 1,5kw

  • OPERATIONAL PRINCIPLES

    STAGE 1: NEUTRALIZATION AND REDUCTION REACTION

    - Free water is collected by pipelines to the air conditioning tank. When the wastewater rates reaches ¼ of the tank rates, the squid tank 1 will signal the control cabinet to activate a pre-mixed chemical pump with a concentration of 0.1% with a flow rate of 1 l / min. . The pump will be limited to 1 minute by a time relay. After 1 minute, the wastewater treatment continues to be added freely to the air conditioning tank with additional reducing agent. When the wastewater reaches the tank volume quá, it will move to stage 2.

    STAGE 2: ANAEROBIC SEDIMENTATION ADSORPTION FILTER

    When the effluent level reaches ¾ the rates of the regulating tank, the squid filter 02 will signal the pump control panel to activate the pump to pump the wastewater into the filter column. The water is pushed through the filter and the filter.
    This phase will last until the water level in the air-conditioning tank drops below 1/3 of the tank volume. At that time, the system will stop waiting for the amount of wastewater reaching the level of 1/3 system to continue processing starting from phase 1.

    STAGE 3: SCALING

    - After anaerobic digestion, the pressure of the water purifier is pushed through the 0.2μm membrane, which removes bacterial residues to meet the standard.
    This process is repeated over a period of time. We need to carry out the addition of reducing agents as well as replacement of the separator.

  • 0.0/ 5

    0 comments

    0
    0
    0
    0
    0
    • Chưa có bình luận nào

RELATED PRODUCTS

0941 113 286